MEP Coordination on Drawings

So pipes, ducts, cables and lifts get their space before the concrete is poured.

Ø168Ø11050150PIPA PVC Ø110(AIR BEKAS)SEALANT FIRE-RATED T.25+ BACKER ROD PESLEEVE BAJA Ø168 T.5MENONJOL 50 DARI FINISHMEMBRAN NAIK 100 KE SLEEVE+ KLEM STAINLESSKERAMIK 30×30 + NAT EPOXYSCREED T.50 MIRING 1%WATERPROOFING MEMBRANPELAT BETON T.150FIRE COLLAR INTUMESEN 2 JAMANGKUR M6 KE PELATWOL BATU PADAT(PACKING ANULUS)PELAT LANTAI BETONPUDDLE FLANGE T.6LAS KELILINGILUSTRASI CONTOHBUKAN UNTUK KONSTRUKSI1K-MEPMEP COORDINATION ON DRAWINGSSKALA 1:5
Level
Advanced
Lessons
18
Time
1h 53m
Rating
4.8
Learners
9.4K
Updated
Oct 2026

After this course

What you'll be able to do yourself.

Ceilings dropping 30 cm in the final week, beams drilled because a pipe hit them, a lift overhead that came up short. These problems are born on the drawing, not on site. You learn to rank routes, work out ceiling space, read a lift shaft and lock openings before the structure is built.

  1. 1Rank service routes, starting with the ones that cannot bend
  2. 2Work out ceiling height at the tightest point
  3. 3Read lift shaft plans, pits and overheads
  4. 4Calculate the load difference between car and counterweight
  5. 5Size sleeves and penetration gaps
  6. 6Submit beam and slab openings to the structural engineer properly

Good for

  • Senior drafters and drawing coordinators on building projects
  • Junior architects who run coordination meetings
  • MEP supervisors who check routes before ceilings close

Full syllabus

Chapter by chapter, nothing hidden.

18 lessons, 1h 53m in total. Chapter 1 is open to everyone.

Chapter 1The fight for ceiling spaceFreeWho gives way, and how much ceiling height is really left.6 lessons / 37 min
  1. Who gives way on a route5 min
  2. Working out ceiling space5 min
  3. The language of coordination4 min
  4. Ceiling height and sprinkler spacing7 min
  5. The corridor ceiling drops 30 cm6 min
  6. Chapter 1 test10 min
Chapter 2Lifts and shaftsCounterweights, rails, pits and overheads to lock in early.6 lessons / 37 min
  1. Lifts are helped by a counterweight5 min
  2. The lift shaft plan5 min
  3. The language of lifts4 min
  4. The load difference the machine pulls7 min
  5. The overhead changes once structure starts6 min
  6. Chapter 2 test10 min
Chapter 3Through slabs, beams and shaftsEvery opening is a structural decision and a fire decision.6 lessons / 39 min
  1. An opening is a structural decision5 min
  2. Sizing sleeves and openings7 min
  3. Adjust the penetration5 min
  4. Read the penetration in the 3D model6 min
  5. Core drilling a beam6 min
  6. Chapter 3 test10 min

Lesson kinds

  • Concept
  • Glossary
  • Calculate
  • Site case
  • Chapter test
  • Slide the Parameter
  • Read a model

Get a feel for it

You practise, you don't just watch.

Try it: Slide the ParameterIllustration, not for construction
Ø168Ø11050150PIPA PVC Ø110(AIR BEKAS)SEALANT FIRE-RATED T.25+ BACKER ROD PESLEEVE BAJA Ø168 T.5MENONJOL 50 DARI FINISHMEMBRAN NAIK 100 KE SLEEVE+ KLEM STAINLESSKERAMIK 30×30 + NAT EPOXYSCREED T.50 MIRING 1%WATERPROOFING MEMBRANPELAT BETON T.150FIRE COLLAR INTUMESEN 2 JAMANGKUR M6 KE PELATWOL BATU PADAT(PACKING ANULUS)PELAT LANTAI BETONPUDDLE FLANGE T.6LAS KELILING

Slide the value. The drawing follows, just like in the lessons.

The sleeve stands clear of the floor finish, so floor water can't get in around it.

Illustration, not for construction

Your creator

Taught by someone who still does the work.

Your creator

Bayu Adinegara

MEP engineer

A practitioner who teaches from their everyday work.

Courses
3
Learners
53.1K

About becoming a creator

Learner reviews

From people who took it.

4.8out of 5

760 reviews

  • 581%
  • 414%
  • 34%
  • 21%
  • 10%
  • Intan Permatasari

    Civil engineering student

    Pipe falls, shaft space, service points. Everything I used to discover on site.

  • Hendra Saputra

    Residential contractor

    The pipe penetration lesson went straight into coordination work at the office.

  • Mega Puspitasari

    Junior architect

    I finally understand why the MEP engineer always asks for a bigger shaft.

Questions that come up

About this course.

All questions

01

What can I try for free?

All of chapter 1, "The fight for ceiling space": 6 lessons, about 37 min. No card needed. If it isn't for you, stop there.

02

What should I know before starting?

It helps to have finished House Plumbing, Electrical and Earthing first. It isn't locked, but the chapters assume you know that material.

03

Subscribe or buy this course?

Pro is Rp149.000 a month and opens every course, track, exam and certificate. Buying this course is Rp389.000 once and it stays yours. If you plan to take more than two courses, Pro usually comes out cheaper.

04

Do I get a certificate?

Certificates come from track exams, not single courses. This course counts toward Plumbing and MEP. The exam runs 60 minutes and you pass at 75 percent.

05

Can I use these drawings on a project?

No. Every drawing in the course is an illustration for learning, not for construction. Use them to understand the logic, then follow your firm's standard and your engineer's drawings.

Part of

This course counts toward these tracks.

Where next

Courses people often take next.

All courses
  • plbFlagship

    Plumbing and MEP / Beginner

    House Plumbing

    Clean water, drains, vents and rainwater, from why it smells to how to draw it.

    Bayu Adinegara
    Lessons
    28
    Time
    2h 54m
    Rating
    4.9
    Learners
    31.2K
  • lst

    Plumbing and MEP / Intermediate

    Electrical and Earthing

    Read electrical drawings, understand earthing, and know when to call a certified installer.

    Bayu Adinegara
    Lessons
    18
    Time
    1h 52m
    Rating
    4.7
    Learners
    12.5K
K-MEPStart with chapter 1

MEP Coordination on Drawings free.

No card needed. If it suits you, go on with Pro or buy this course.